Methodology, Estimator Equations & Zero-Fake-Data Charter
Every number computed in the ArkiTechies workbench comes from explicit, user-editable mathematical formulas or verifiable published industry standards — never black-box multipliers or synthetic reviews.
1. AIA Residential Architect Fee & Budget Formulas (Sheet A-01)
Our interactive residential and ADU estimator models project budgets using standard AIA B101-2017 / B105-2017 separation between the Cost of the Work (hard construction cost) and soft professional/regulatory costs:
- Hard Construction Cost = Gross Conditioned Sq Ft × Regional Build Rate ($/sq ft)
- AIA Architect Basic Services Fee = Hard Construction Cost × (Architect Fee % ÷ 100)
- Phase Allocations: SD = 15% · DD = 20% · CD = 40% · Bidding = 5% · CA = 20%
- Structural / MEP Engineering Allowance = Hard Construction Cost × (Eng % ÷ 100)
- Municipal Plan-Check & Permit Fees = Hard Construction Cost × (Permit % ÷ 100)
- All-In Estimated Budget = Hard Cost + Architect Fee + Engineering + Permits (users should hold an additional 10% new-build or 15% remodel owner contingency separately).
2. Architectural Scale & Print Calibration Equations (Sheet A-02)
All imperial architectural, imperial civil engineering, and ISO metric scale conversions reduce to exact dimensionless scale factors N (for example, 1/4" = 1'-0" → 12 ÷ 0.25 = 48):
- Drawing Paper Length = Real Building Length ÷ N
- Real Building Length = Measured Paper Length × N
- Print Scale Error % = ((Measured Printed Bar − Expected Bar) ÷ Expected Bar) × 100
- Printer Driver Zoom Correction % = (Expected Bar ÷ Measured Printed Bar) × 100
- 40-Foot Span Drift (inches) = |480 × (Print Scale Error % ÷ 100)|
3. Verifiable Primary Standards & Vendor Sources
| Domain Area | Primary Reference Standard / Source | How Used on ArkiTechies |
|---|---|---|
| Architectural Contracts & Phases | AIA Document B101-2017 & B105-2017 Standard Form of Agreement Between Owner and Architect | 5-phase Basic Services split (SD 15%, DD 20%, CD 40%, BN 5%, CA 20%) and separation of hard vs. soft costs. |
| ADU Setbacks & Ministerial Rules | California Government Code §§ 66310–66342 (§ 66314 4-ft setback cap; § 66321 guaranteed 800 sq ft envelope) | Statutory ADU setback, ministerial 60-day review, and <750 sq ft impact-fee exemption guidance. |
| Drawing Sheets & Numbering | US National CAD Standard (NCS), ASME/ANSI Y14.1, ISO 216 (A0–A4) | ARCH D (24×36), ANSI D (22×34), ISO A1 (594×841 mm) sizing and exact half-scale rules. |
| CAD/BIM Software Pricing | Official vendor commercial US list pricing (2025–2026 terms: Autodesk, Graphisoft, McNeel, Trimble, Chief Architect, Vectorworks, Bluebeam, Chaos, Act-3D, Epic Games, Hover) | Comparator matrix, 3-year/5-year list TCO examples, and explicit custom-quote labeling for Monograph, BQE CORE, and Deltek Ajera. |
4. Zero-Fake-Data & Editorial Independence Charter
ArkiTechies never invents customer counts, star ratings, synthetic review counts, fake testimonials, or fabricated savings counters. Paid sponsorships and Verified Listings are clearly labeled and cannot alter factual published pricing, OS support facts, or mathematical formulas.